
FD1200
High-capacity deep-hole platform for demanding wireline core exploration projects.
Technical Parameters
Standard configuration shown. Final specifications can be matched to working conditions, optional equipment and destination requirements.
| BTW Drilling Depth | 1,400 m |
|---|---|
| NTW Drilling Depth | 1,200 m |
| HTW Drilling Depth | 1,000 m |
| Cooling Method | Water / air cooling |
| Engine | Yuchai |
| Rated Power | 132 kW |
| Rated Speed | 2,300 rpm |
| Maximum Torque | 3,000 Nm |
| Maximum Rotary Speed | 1,400 rpm |
| Feed Stroke | 2 m |
| Lifting Force | 24 T |
| Propulsive Force | 12 T |
| Wireline Capacity | 1,400 m |
| Winch Pull | 24 kN |
| Hoisting Speed | 110 m/min |
| Wire Rope Diameter | 8 mm |
| Mast Height | 8.6 m |
| Drilling Angle | 45–90° |
| Mast Compensation | 900 mm |
| Hydraulic Clamp | 114 mm |
| Gradeability | 30° |
| Track Type | Steel track |
| Travel Speed | 3 km/h |
| Mud Pump | BW160 |
| Working Dimensions | 4,700 × 2,100 × 7,000 mm |
| Transport Dimensions | 5,700 × 2,100 × 2,400 mm |
| Machine Weight | 7.8 T |
Factory Supply
Direct equipment selection and configuration support from XIAORAN MACHINERY.
Project Matching
Model recommendations based on target depth, terrain, working height or lifting requirement.
Export Support
Documentation, loading coordination and spare-parts support for international delivery.
Choosing the FD1200 for core exploration
The FD1200 is listed for 1,200 m NTW drilling depth with 132 kW rated power and a 45–90° drilling angle. Compare the required core size and formation with the BTW and HTW depths in the table. Confirm the rod string, mud pump, winch and site access before ordering; published depths are configuration references, not a guarantee for every formation.
Read equipment selection guides → Discuss this configuration →
